The nod was given on October 29, agreeing to all the details associated with the joinery (design. . etc.) at the covent garden branch of Murdocks and on November the 22nd we delivered the last piece of joinery to complete the order. We all worked day and night for 3 weeks to get the job done. All in all there where 22 independant pieces varying from the cash desk, barber units, display counters and shelving systems.
This display unit was made up in two parts. The upper section was with Oak uprights with cnc machining. The shelves were adjustable with Lazer cut and powder coated brackets. The lower part was made for Oak veneered MDF with Red 'color-core' top and brass plinth.

This was part of the display area in the lower part of the shop. Using a similar style of adjustable shelving inspired by gym wall bars. The modular shelves fitted throughout the store.
This was one of the double barber units in made by us. The specification was highly detailed.
This is one of three display units we made. Materials: Solid Oak Frame, Stainless steel shelving support system and glass shelves.
The shop opened on-time and was well received by Brendan the owner, staff and their regular clients.













